OC4 Project
Location: Kriel, Mpumalanga, South Africa
Permit Holder: 2 Seam (Pty) Ltd
Mining Contractor: Trollope Mining Services
Project Value: Approx. 1 million tonnes of mineable coal reserves
Timeline: Late 2020 – Early 2
Synopsis
The OC4 Project represented a strategic continuation of operations following OC2A, tapping into new coal reserves within the broader Kriel mining right. With roughly 1 million tonnes in mineable reserves, OC4 laid the foundation for expanded surface mining activity in the area.
Operations were executed by Trollope Mining Services, bringing in high-volume open-cast mining capability. Though OC4 production began just ahead of the global coal market spike, it primarily functioned as a preparatory and stabilizing phase—positioning the operation for significant upside in the next pit (OC4A).
Lessons Learned & Institutional Growth
Built out infrastructure that was directly leveraged by OC4A.
Established stable offtake agreements and operational routines.
Reinforced the strength of long-term permit holdings like 2 Seam’s.
Served as a low-risk ramp-up phase for full exposure to global coal price movements.
Key Takeaways for Investors
Stable production base in a strategic location.
Efficient execution by a reputable mining contractor (Trollope).
Proof-of-concept for larger adjacent pits.
Precursor to significant market opportunity captured in OC4A.